Event Number |
Event Description |
End Date |
End time |
Purchasing Group |
3000035722 |
BMII_T_58_tungsten carbide coated hardli |
08-02-2023 |
16:00:00 |
CSTPS Group A |
3000035346 |
CHPD_AUXILIARY CHARGE PUMP FOR HYDRAULIC |
08-02-2023 |
16:00:00 |
CSTPS Group A |
3000034926 |
BMII_AMC FOR FLY,COARSE,BOTTOM ASH EVACU |
08-02-2023 |
16:00:00 |
CSTPS Group A |
3000034872 |
CHPD/190/hydraulic motor for side arm |
08-02-2023 |
16:00:00 |
CSTPS Group A |
3000035317 |
CHPD_WORK CONTRACT FOR MECHANIZED ARRANG |
08-02-2023 |
16:00:00 |
CSTPS Group D |
3000032315 |
CHPB_T_1186_BOXN-HL WAGON |
08-02-2023 |
16:00:00 |
CSTPS Group D |
3000033256 |
Supply of mechanical seals for LP BCP. |
08-02-2023 |
15:00:00 |
GTPS Group A |
3000035004 |
supply of SISW direct driven centrifugal |
08-02-2023 |
15:00:00 |
GTPS Group B |
3000035341 |
AWC FOR OPERATIONS OF WAREGAON , ETP-2 & |
08-02-2023 |
15:00:00 |
KPKD Group A |
3000035278 |
MICROPROCESSOR CONTROLLED BALL VALVE |
08-02-2023 |
15:00:00 |
KPKD Group A |
3000033744 |
NEOPRENE RUBBER DIAPHRAGMS& GASKETS AT W |
08-02-2023 |
15:00:00 |
KPKD Group A |
3000035269 |
SERVICING OF ROTORK MAKE MOTORISED VALVE |
08-02-2023 |
15:00:00 |
KPKD Group B |
3000035062 |
MC for various electrical works of ESP d |
08-02-2023 |
15:00:00 |
KPKD Group B |
3000030821 |
COMPLETE REWINDING,REPLACEMENT OF COMMUT |
08-02-2023 |
15:00:00 |
KPKD Group B |
3000030088 |
SUPPLY,ERECTION&COMM.OF VORTEX FLOW METE |
08-02-2023 |
15:00:00 |
KPKD Group B |
3000035323 |
CONDENSER TUBE CLEANING U-1 AOH |
08-02-2023 |
15:00:00 |
KPKD Group C |
3000034950 |
AC for servicing of diesel engines for f |
08-02-2023 |
15:00:00 |
KPKD Group C |
3000034395 |
MACHINING OF TG EQUIPMENTS AT U-1 |
08-02-2023 |
15:00:00 |
KPKD Group C |
3000033695 |
Supply of Walky-Talky,Siren & Elect util |
08-02-2023 |
15:00:00 |
KPKD Group D |
3000034359 |
I&C-210 Procurement of Position Transmit |
08-02-2023 |
15:00:00 |
KTPS Group C |
3000034220 |
I&C-660 Procurement of various Limit Swi |
08-02-2023 |
15:00:00 |
KTPS Group C |
3000035144 |
CHP-210 WORK OF HIRING OF DOZERS |
08-02-2023 |
15:00:00 |
KTPS Group D |
3000035141 |
CHP-660 W_STRENGTHNING OF TRIPPER TROLLE |
08-02-2023 |
15:00:00 |
KTPS Group D |
3000034995 |
CHP-660 S_PROC.OF LT BREAKER FOR SWTCHGR |
08-02-2023 |
15:00:00 |
KTPS Group D |
3000035127 |
Security-210 design, development and pro |
08-02-2023 |
15:00:00 |
KTPS Group E |
3000034759 |
CIVIL-660 Lifting deposited ash as & whe |
08-02-2023 |
15:00:00 |
KTPS Group E |
3000035271 |
Sply ,erect,tstng ofstatic excitaon@SHP |
08-02-2023 |
15:00:00 |
Nashik Circle |
3000035236 |
AHP:AMC OF COMPLETE OPERATION ROUND CLK |
08-02-2023 |
16:00:00 |
PARS Group A |
3000034893 |
WTP:REMOVAL DAMAGED RUBBER LINING |
08-02-2023 |
16:00:00 |
PARS Group A |
3000034991 |
CHP:Work of chute choke up removal |
08-02-2023 |
16:00:00 |
PARS Group D |
3000035500 |
Procurement spares clarifier system |
09-02-2023 |
11:00:00 |
BTPS Group A |
3000035354 |
T360/22AMCof cleaningactivation of resin |
09-02-2023 |
11:00:00 |
BTPS Group A |
3000035218 |
T489/22 AMC for OFC fault finding |
09-02-2023 |
11:00:00 |
BTPS Group A |
3000034835 |
T588/22_On site Inspection_Stacker_CHP |
09-02-2023 |
11:00:00 |
BTPS Group D |
3000034434 |
Skilled & Unskilled Persons at GPII CG |
09-02-2023 |
15:00:00 |
CO Group G |
3000035759 |
BMII_T_1992_Ultrasonic Thickness Measure |
09-02-2023 |
16:00:00 |
CSTPS Group A |
3000035730 |
BMII_T_223_Replacement of Inner Cone |
09-02-2023 |
16:00:00 |
CSTPS Group A |
3000035729 |
BMII_T_2265_Work of Guillotine Gate |
09-02-2023 |
16:00:00 |
CSTPS Group A |
3000035683 |
I&C-II/T-397, Work contract for cleaning |
09-02-2023 |
16:00:00 |
CSTPS Group A |
3000035348 |
BM-II_T_1830_Tripal Screw Lub Oil Pump |
09-02-2023 |
16:00:00 |
CSTPS Group A |
3000035678 |
EMII_ST_2090_SUPPLY OF HT MOTOR 11 KV MU |
09-02-2023 |
16:00:00 |
CSTPS Group C |
3000035340 |
CHP-A/T-2014 AMC HIRING OF AMBULANCE/WIN |
09-02-2023 |
16:00:00 |
CSTPS Group E |
3000034961 |
SPARES FOR DIESEL GENERATOR ENGINES & FF |
09-02-2023 |
15:00:00 |
KPKD Group A |
3000033969 |
AWC for disposal of hazardous waste gene |
09-02-2023 |
15:00:00 |
KPKD Group A |
3000033211 |
SUPPLY OF ALUMINA FERRIC(ALUM) FOR WTP-I |
09-02-2023 |
15:00:00 |
KPKD Group A |
3000031666 |
Supply of 5"Air cooler ass. & 2 ton A.C |
09-02-2023 |
15:00:00 |
KPKD Group A |
3000035074 |
WORK OF HT MOTOR REWINDING UPTO 1000 KW |
09-02-2023 |
15:00:00 |
KPKD Group B |
3000034264 |
Calibration & serv of yokogawa make oxyg |
09-02-2023 |
15:00:00 |
KPKD Group B |
3000033745 |
TOOLS,TACKLES&GENERAL CONSUMABLES AT EMI |
09-02-2023 |
15:00:00 |
KPKD Group B |
3000032164 |
LT POWER CABLE FOR EXTENSION OF DC CONTR |
09-02-2023 |
15:00:00 |
KPKD Group B |
3000035267 |
Work of overhauling of LP valves at U#3 |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000035259 |
Alignment & locking of PSH,FSH & RH coil |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000034829 |
Work of removal & refitting of drum inte |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000034493 |
ROBOTIC ECONOMISER& LTSH COIL INSPECTION |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000034392 |
OVERHAULING/SERVICING OF LP VALVES AOH |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000033406 |
ROBOTIC ECONOMISER & LTSH COIL INSPECTIO |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000031743 |
SPECIAL CHAIN PULLEY BLOCKS WITH EXTRA L |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000030331 |
WORK OF CIRCULATING WATER PUMPS ( CW PUM |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000030089 |
WORK OF TRANSPORTATION OF MATERIAL/SCRAP |
09-02-2023 |
15:00:00 |
KPKD Group C |
3000032188 |
SPARES FOR BELT WEIGHERS AND WEIGHBRIDGE |
09-02-2023 |
15:00:00 |
KPKD Group D |
3000035434 |
CIVIL-660 FODDER FARM 4 NOS. OUTSIDE POW |
09-02-2023 |
15:00:00 |
KTPS Group E |
3000035432 |
CIVIL-660Fodder farm 5 Nos. for one year |
09-02-2023 |
15:00:00 |
KTPS Group E |
3000035430 |
CIVIL-660 FODDER FARM 4 NOS. INSIDE POWE |
09-02-2023 |
15:00:00 |
KTPS Group E |
3000035067 |
BM:WORK REPLACEMENT CERAMIC INNER CONE |
09-02-2023 |
16:00:00 |
PARS Group A |
3000034989 |
CHP:AMC handling store at CHP |
09-02-2023 |
16:00:00 |
PARS Group D |
3000034790 |
Proc of RTD/TC spares for C&I NPTPS |
09-02-2023 |
12:00:00 |
PRLI Group B |
3000035170 |
Oil seal, brass bush with O ring CM & CF |
09-02-2023 |
12:00:00 |
PRLI Group C |
3000034972 |
BURNER TILT SERV & COAL COMP BM8 AOH |
09-02-2023 |
12:00:00 |
PRLI Group C |
3000034970 |
Water Leakage from Guide Vane |
10-02-2023 |
17:00:00 |
BHIRA |
3000035391 |
T708/22WOrk of repar tran assembly |
10-02-2023 |
11:00:00 |
BTPS Group A |
3000035180 |
spares DM plan acid injection system |
10-02-2023 |
11:00:00 |
BTPS Group A |
3000034850 |
T556/22 proc of LED lighting matterial |
10-02-2023 |
11:00:00 |
BTPS Group A |
3000034601 |
Supply & installation of Cast Basalt Pip |
10-02-2023 |
15:00:00 |
CE (Stores) CHA |
3000035188 |
Providing & fixing various bonds for pro |
10-02-2023 |
14:00:00 |
CSTPS Civil GrpB |
3000035254 |
Miscellaneous civil works at Nirman Bhav |
10-02-2023 |
15:00:00 |
CSTPS Civil GrpB |
3000035787 |
BMII_T_1376_Reconditioning of ID Fan NDZ |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035652 |
BMII_T_1929_Various Sapres for Fly Ash E |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035651 |
BMII_T_Replacement fo KMS 850 GearBox |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035217 |
BMII_T_1787_Arresting Leakages through w |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035140 |
BMIC_T1417_SW_Replacement of ESP inrenal |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035098 |
OSII_T2124_Supply of Ammonia Gas |
10-02-2023 |
16:00:00 |
CSTPS Group A |
3000035100 |
T1953_AMC_Operation & Maintenance of 150 |
10-02-2023 |
16:00:00 |
CSTPS Group B |
3000035576 |
I&C-II/T-399, Repair & restoratio of BAH |
10-02-2023 |
16:00:00 |
CSTPS Group C |
3000034987 |
T1191/S-SMART ELECTROPENUMATIC DOUBLE |
10-02-2023 |
16:00:00 |
CSTPS Group C |
3000033012 |
T-614/SUPPLY OF ELECT LIGHTING MATERIAL |
10-02-2023 |
16:00:00 |
CSTPS Group C |
3000035339 |
CHP-A/RFT-970 PROCUREMENT OF SPARES,RAIL |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000035319 |
CHPB/704/Redium reflective display board |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000035251 |
CHPB/1620/Return roller frames |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000035239 |
CHPC/827/Maintenance of Air Comp |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000034920 |
CHPB_T_T1567_Floating Shaft Assembly |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000034919 |
CHPBEM_T_1522_Upgradation of 10T EOT Cra |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000034774 |
CHPB_PLC System for automation |
10-02-2023 |
16:00:00 |
CSTPS Group D |
3000035322 |
CHP-A/T-2101 AMC OF TATA 407vehicle ARW |
10-02-2023 |
16:00:00 |
CSTPS Group E |
3000034803 |
CHP-A/T-1388 AMC OF HIRING OF ONE BOLERO |
10-02-2023 |
16:00:00 |
CSTPS Group E |
3000033646 |
Various allied work related to Blr Inspe |
10-02-2023 |
15:00:00 |
GTPS Group A |
3000035494 |
AVAILING ENGINEERING STAFF SERVICES |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000035358 |
REPARING & PROVIDING OF ALUMINIUM PARTI |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000035121 |
MAINT OF BOTTOM ASH, COARSE ASH EVACUATI |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000035063 |
Operation & maint of ozone generating pl |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000035032 |
AMC FOR ELECTRONIC ROAD WEIGH BRIDGE 60M |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000034388 |
PROC. OF BUDDY BOX(GEAR BOX) WITH MOTOR |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000033560 |
Complete assembly of BFP booster pump FA |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000032754 |
PROVIDING& FIXING VERTRIFIED TILES TO A, |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000030766 |
WORM SHAFT WITH LOCK NUT & KEYS FOR GEAR |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000030435 |
VERTICAL PUMPS SPARES. |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000028897 |
MOVING MACHINERIES ON AS AND WHEN RED |
10-02-2023 |
15:00:00 |
KPKD Group A |
3000035088 |
Lighting material for insta CCTV cameras |
10-02-2023 |
15:00:00 |
KPKD Group B |
3000033829 |
Hiring & maint of fully exhausted air co |
10-02-2023 |
15:00:00 |
KPKD Group B |
3000033544 |
SUPPLY OF
VARIOUS ELECTRICAL CONTROL CK |
10-02-2023 |
15:00:00 |
KPKD Group B |
3000033520 |
Spreading of new 40MM black metal stones |
10-02-2023 |
15:00:00 |
KPKD Group B |
3000032253 |
'S' & 'R' TYPE THERMOCOUPLES |
10-02-2023 |
15:00:00 |
KPKD Group B |
3000035043 |
Repairing of CCI make plug aasembly of B |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000035021 |
MS FINS, SS SHROUD TUBE & MS WIRE MESH |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000034952 |
MATCHINING OF TG EQUIPMENTS |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000033965 |
Proc of radiator coil of air handling un |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000033962 |
LUBE OIL PUMPS FOR FD, ID FAN & APH |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000031306 |
Spares for journal spring assy.of XRP 10 |
10-02-2023 |
15:00:00 |
KPKD Group C |
3000034472 |
UPGRADATION OF WEIGHTECH HARDWARE AND SO |
10-02-2023 |
15:00:00 |
KPKD Group D |
3000035377 |
Annual contract for hiring of Taxi |
10-02-2023 |
12:00:00 |
KTPS GC GrpA |
3000034946 |
PROC. OF NON SLAM NRVS AHP 660MW |
10-02-2023 |
15:00:00 |
KTPS Group A |
3000035365 |
TIC-10Channel chartless recorders |
10-02-2023 |
10:00:00 |
NTPS Group A |
3000034657 |
TIC-Proc of 48channel chartless recorder |
10-02-2023 |
10:00:00 |
NTPS Group A |
3000034621 |
BM- Supply of sampling coolers |
10-02-2023 |
10:00:00 |
NTPS Group A |
3000031819 |
TIC- Proc of MK6 positioner power cylind |
10-02-2023 |
10:00:00 |
NTPS Group A |
3000034639 |
EM - AWC for HT transf oil filteration |
10-02-2023 |
10:00:00 |
NTPS Group E |
3000028167 |
EM-WC for HT Motor O/H U 3 4 5 |
10-02-2023 |
10:00:00 |
NTPS Group E |
3000035212 |
Bi yearly AMC for office services at NTC |
10-02-2023 |
13:00:00 |
NTPS Training
Group |
3000035109 |
Bi-yrly AMC for Housekeeping at NTC |
10-02-2023 |
13:00:00 |
NTPS Training
Group |
3000035041 |
Renovation of Elect.Installation at NTC |
10-02-2023 |
15:00:00 |
NTPS Training
Group |
3000035333 |
BM:Work of replacement reducer gear box |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035314 |
CIVIL:BIENNIAL CONTRACT FOR SWEEPING |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035312 |
BM:PROC. OF VARIOUS CONSUMABLES |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035310 |
WORK:AMC 2 YR GARDEN MAINTENANCE COLONY |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035302 |
CIVIL: BIENNIAL WORK PLUMBER, CARPAINTE |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035296 |
TM: PROC. HP-BYPASS VALVE ACTUATOR SEAL |
10-02-2023 |
16:00:00 |
PARS Group A |
3000035334 |
AHP: Pro.of spares for air compressor |
10-02-2023 |
16:00:00 |
PARS Group C |
3000035332 |
TM:Pro.of overhaul kit of compressor U#3 |
10-02-2023 |
16:00:00 |
PARS Group C |
3000035297 |
TM: PROC SEAL OIL COOLER ASSEMBLY |
10-02-2023 |
16:00:00 |
PARS Group C |
3000035227 |
CHP: MONITORING OF HYDRAULIC SYSTEM |
10-02-2023 |
16:00:00 |
PARS Group D |
3000035051 |
Mechanical Overspeed Devices |
11-02-2023 |
11:00:00 |
BHATGHAR |
3000035417 |
Reconditioning impellar AHP 500MW |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000035335 |
AMC for control cabling work |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000035330 |
Providing vehicle for Manager(Security) |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000035147 |
T388/22_Rapairing 220V battery cells_CHP |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000035017 |
T627/22 proc of
ceiling wall mount fans |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000035016 |
T374/22 proc of FRP ladders |
11-02-2023 |
11:00:00 |
BTPS Group A |
3000034116 |
Supply, erection and commng of high mast |
11-02-2023 |
17:00:00 |
BTPS Proj GrpA |
3000034673 |
EMIII-T357 /W_shifting of ControlPanels |
11-02-2023 |
16:00:00 |
CSTPS Group C |
3000033819 |
TIC/T1610/PROCUREMENT OF NEOPRENE RUBBER |
11-02-2023 |
16:00:00 |
CSTPS Group C |
3000035363 |
TECH/T-1312/ENGAGING VEHICLE |
11-02-2023 |
16:00:00 |
CSTPS Group E |
3000035294 |
TECH/T-688/ PHOTOGRAPHY |
11-02-2023 |
16:00:00 |
CSTPS Group E |
3000035256 |
PROC. OF CG CHAIN AHP 660MW |
11-02-2023 |
15:00:00 |
KTPS Group A |
3000035097 |
MS-210 MW_W_AWC HOUSEKEEPING N CLEANING |
11-02-2023 |
15:00:00 |
KTPS Group A |
3000035249 |
WTP-210 O & M of STP Koradi TPS |
11-02-2023 |
15:00:00 |
KTPS Group B |
3000035351 |
CHP-660 W_HIRING OF DOZERS 2 DOZING COAL |
11-02-2023 |
15:00:00 |
KTPS Group D |
3000035580 |
WTP: WORKS&SUPPLY BOMB CALORIMETER |
11-02-2023 |
16:00:00 |
PARS Group A |
3000034597 |
T646/22 amc for assiatsnce to emt u5 |
13-02-2023 |
11:00:00 |
BTPS Group A |
3000035385 |
Pr.painting at MSPGCL,Mumbai |
13-02-2023 |
17:00:00 |
CE (Civil III) |
3000035308 |
Supply of Steel Wire Ropes for CSTPS |
13-02-2023 |
15:00:00 |
CE (Stores) CHB |
3000035105 |
Coal cell/T_1724/Impex pulveriser |
13-02-2023 |
16:00:00 |
CSTPS Group A |
3000034873 |
ODPII/1722/Repairing of valves |
13-02-2023 |
16:00:00 |
CSTPS Group A |
3000035505 |
TMII_T1474_S AXIAL PISTON PUMP FOR OIL S |
13-02-2023 |
16:00:00 |
CSTPS Group B |
3000035106 |
Coal cell/T_1745/hammer mill crusher |
13-02-2023 |
16:00:00 |
CSTPS Group B |
3000035337 |
TICI_Calibration of MSA Leak Detector |
13-02-2023 |
16:00:00 |
CSTPS Group C |
3000034990 |
overhauling and testing of GT unit-8 Gen |
13-02-2023 |
15:00:00 |
GTPS Group B |
3000035279 |
SUPPLY OF THERMOSTAT FOR 210 MW |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000035038 |
OVERHAULING OF DM EXCHANGERS, PTP, ETP |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000034962 |
VARIOUS SIZES OF LOW PRESSURE VALVE |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000034799 |
CFD ANALYSIS,MFG,SUPPLY&ERECTION OF DIVE |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000034578 |
PROCUREMENT OF SPARES FOR REFRIGERANT |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000034327 |
CARRYING HIGHLY
EXPLOSIVE HYDROGEN GAS |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000033690 |
MAINT. & UPGRADATION OF BOMB CALORIMETER |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000031398 |
PROCUREMENT OF 125 NB SEAMLESS PIPES |
13-02-2023 |
15:00:00 |
KPKD Group A |
3000034949 |
Servicing of various make motorised valv |
13-02-2023 |
15:00:00 |
KPKD Group B |
3000034755 |
SPEED SENSORS OF MAIN TURBINE & TDBFP |
13-02-2023 |
15:00:00 |
KPKD Group B |
3000034535 |
HIRING SERVICES OF EXTERNAL AGENCY |
13-02-2023 |
15:00:00 |
KPKD Group B |
3000033966 |
Lifting, shifting of 250MVA,spare genera |
13-02-2023 |
15:00:00 |
KPKD Group B |
3000033252 |
FRP MOTOR CANOPY FOR VARIOUS ELECTRICAL |
13-02-2023 |
15:00:00 |
KPKD Group B |
3000035406 |
WC FOR COMPLETE REMOVAL &APPLICATION OF |
13-02-2023 |
15:00:00 |
KPKD Group C |
3000032943 |
JOURNAL ASSY. HEAD LINER SUPPORT |
13-02-2023 |
15:00:00 |
KPKD Group C |
3000033468 |
SUPPLY OF HOLD BACK (BACKSTOP) DEVICE |
13-02-2023 |
15:00:00 |
KPKD Group D |
3000021137 |
SUPPLY OF
BEARING HOUSINGS, LABYRINTH |
13-02-2023 |
15:00:00 |
KPKD Group D |
3000035460 |
Annual Contract for Computer Operators |
13-02-2023 |
12:00:00 |
KTPS GC GrpA |
3000035403 |
REP & REC OF DRCG AHP 660MW |
13-02-2023 |
15:00:00 |
KTPS Group A |
3000035134 |
BM-210 Contract of burner tilt mechanism |
13-02-2023 |
15:00:00 |
KTPS Group A |
3000035357 |
contract for operation of Raw Water Filt |
13-02-2023 |
15:00:00 |
KTPS Group B |
3000035253 |
CHP-660 W_ERECTION OF SWEEPING CHUTE TP7 |
13-02-2023 |
15:00:00 |
KTPS Group D |
3000035246 |
CHP-660 W_OVERHAULING OF WOBBLER FEEDERS |
13-02-2023 |
15:00:00 |
KTPS Group D |
3000035210 |
CHP-210 MAINT OF ELECTRONIC WEIGHBRIDGE |
13-02-2023 |
15:00:00 |
KTPS Group D |
3000035204 |
C&I: PROC COLLINS POSITION FEEDBACK TRAN |
13-02-2023 |
16:00:00 |
PARS Group B |
3000030757 |
Hiring of vehicle for security staff |
14-02-2023 |
17:00:00 |
BTPS Proj GrpA |
3000035374 |
Boiler Spares 210 MW Khaperkheda TPS |
14-02-2023 |
14:00:00 |
CE (Stores) CHC |
3000034777 |
Store shed |
14-02-2023 |
15:00:00 |
Civil I |
3000035788 |
BMII_T_2100_Supply of Deck Spring Assemb |
14-02-2023 |
16:00:00 |
CSTPS Group A |
3000035539 |
TMII_T842_AMC DG Set diesel engines |
14-02-2023 |
16:00:00 |
CSTPS Group E |
3000035059 |
Civil/T-1874/AMC grass cutting U-8 & 9 |
14-02-2023 |
16:00:00 |
CSTPS Group E |
3000035058 |
Civil/T-1961/Cons. of watch tower Koyana |
14-02-2023 |
16:00:00 |
CSTPS Group E |
3000034909 |
Supply of combustion chamber bricks |
14-02-2023 |
15:00:00 |
GTPS Group A |
3000034958 |
SUPPLY OF SHAFT SEAL AND WEARING RING |
14-02-2023 |
17:00:00 |
KGSC Group C |
3000035627 |
SUPPLY AND INSTALLATION OF DESKTOP |
14-02-2023 |
15:00:00 |
KPKD Group A |
3000035409 |
EPOXY PAINTING TO THE ACID &ALKALI TANKS |
14-02-2023 |
15:00:00 |
KPKD Group A |
3000033359 |
SUPPLY OF TRI SODIUM PHOSPHATE AT WTP-I |
14-02-2023 |
15:00:00 |
KPKD Group A |
3000030608 |
Proc of Mixer coupling tyres,Coupling sp |
14-02-2023 |
15:00:00 |
KPKD Group A |
3000032737 |
PROC. OF FLEXIBLE CABLES FOR EM-II |
14-02-2023 |
15:00:00 |
KPKD Group B |
3000032074 |
LT POWER CABLES REQUIRED FOR EM-II |
14-02-2023 |
15:00:00 |
KPKD Group B |
3000035522 |
EXPERT SERVICES FOR 115/25T EOT CRANES |
14-02-2023 |
15:00:00 |
KPKD Group C |
3000031299 |
RE-BABITTING OF WORN OUT PILLOW BLOCK BR |
14-02-2023 |
15:00:00 |
KPKD Group C |
3000035185 |
SAFETY-660MW S_HV ELECT INSULATING MAT |
14-02-2023 |
15:00:00 |
KTPS Group E |
3000035301 |
EM-30 to 36 W light panel fitting at PCR |
14-02-2023 |
10:00:00 |
NTPS Group A |
3000035285 |
CHP-Polyrub buffer pad For Wagon Tipler |
14-02-2023 |
10:00:00 |
NTPS Group A |
3000035096 |
TIC- Sup,Ere& Comm of H2 purity meter |
14-02-2023 |
10:00:00 |
NTPS Group A |
3000035095 |
TIC-Proc of spares for U4 turbo. system |
14-02-2023 |
10:00:00 |
NTPS Group A |
3000035284 |
CHP-AMC for prov serv for Stacker reclai |
14-02-2023 |
10:00:00 |
NTPS Group C |
3000034741 |
AWC prov Auto rickshaw day2day maint ODP |
14-02-2023 |
10:00:00 |
NTPS Group C |
3000034691 |
Casting pipeline, CRM-ERM Gear box |
14-02-2023 |
10:00:00 |
NTPS Group C |
3000035300 |
EM- Repars & rewinding of rectiformers |
14-02-2023 |
10:00:00 |
NTPS Group E |
3000035299 |
EM- Name plate/Boards on HT/LT Auxlaries |
14-02-2023 |
10:00:00 |
NTPS Group E |
3000035148 |
EM-Retrofitting of 6.6KV VCB U3 UAT |
14-02-2023 |
10:00:00 |
NTPS Group E |
3000034647 |
EM - WC for HT motor O/H U4 AOH |
14-02-2023 |
10:00:00 |
NTPS Group E |
3000033882 |
Supply of Industrial Safety Shoes |
14-02-2023 |
16:00:00 |
PANSHET |
3000035426 |
Procurement of Tarpaulin for MSPGCL |
15-02-2023 |
12:00:00 |
CE (Stores) CHD |
3000035801 |
BMII_T_1921_Overrunning Clutch |
15-02-2023 |
16:00:00 |
CSTPS Group A |
3000035219 |
WTP_II/T_1730/Analysers |
15-02-2023 |
16:00:00 |
CSTPS Group B |
3000035288 |
Civil/T-2173/AMC misc repair & civil wor |
15-02-2023 |
16:00:00 |
CSTPS Group E |
3000030055 |
DISC SPRING FOR LP BYPASS STOP VALVE SER |
15-02-2023 |
15:00:00 |
KPKD Group C |
3000035226 |
BM-660
Procurement of Sodium Silicate f |
15-02-2023 |
15:00:00 |
KTPS Group A |
3000035195 |
(BM-210)Procurement of Feeder Belt |
15-02-2023 |
15:00:00 |
KTPS Group A |
3000035113 |
TM-210 Providing operator for operation |
15-02-2023 |
15:00:00 |
KTPS Group B |
3000035049 |
TM-660 Proc. Spares WDC control valve |
15-02-2023 |
15:00:00 |
KTPS Group B |
3000034994 |
I&C-210 Procurement of smart positioner |
15-02-2023 |
15:00:00 |
KTPS Group C |
3000035224 |
CHP-210 SUPPLY OF HT< CABLE JOINTING |
15-02-2023 |
15:00:00 |
KTPS Group D |
3000035194 |
Safety-660_Preparation, fabrication and |
15-02-2023 |
15:00:00 |
KTPS Group E |
3000035466 |
CHP: PROC SUBMERSIBLE SLURRY PORTABLE PU |
15-02-2023 |
16:00:00 |
PARS Group A |
3000035412 |
SAFETY:WORK LIFTING TOOLS TACKLES PRESSU |
15-02-2023 |
16:00:00 |
PARS Group A |
3000035410 |
AHP:WORK 2 YR monitoring, patrolling GAU |
15-02-2023 |
16:00:00 |
PARS Group A |
3000035399 |
AHP:Work monitoring and operation of ash |
15-02-2023 |
16:00:00 |
PARS Group A |
3000035398 |
WTP:WORK DOSING CHLORINE GAS AT NDCT |
15-02-2023 |
16:00:00 |
PARS Group A |
3000035240 |
CIVIL:WORK OF QUARTER DISMENTELING |
15-02-2023 |
16:00:00 |
PARS Group A |
3000034942 |
Services of Pharmacist at Dispensar PTPS |
15-02-2023 |
12:00:00 |
PRLI Group A |
3000034344 |
Work of overhauling of HP Bypass Cotrol |
15-02-2023 |
12:00:00 |
PRLI Group B |
3000034752 |
Work of compressor maint. @TM-8 |
15-02-2023 |
12:00:00 |
PRLI Group C |
3000034849 |
HIRING OF PICKUP OR EQUIVALENT VEHICLE |
15-02-2023 |
12:00:00 |
PRLI Group D |
3000035458 |
T661/22AMC of servicing of air coolers |
16-02-2023 |
11:00:00 |
BTPS Group A |
3000035243 |
T73/22Proc of Thermal InsulationRockwool |
16-02-2023 |
11:00:00 |
BTPS Group A |
3000035094 |
CE/FM/E2/SECL-RCR/2023/35094 |
16-02-2023 |
14:00:00 |
CE (FMC) |
3000035361 |
BMIII_T-59_Procurement of SS shields of |
16-02-2023 |
16:00:00 |
CSTPS Group B |
3000035153 |
WTP_II/T_1703/Analytical lab reagents |
16-02-2023 |
16:00:00 |
CSTPS Group B |
3000035438 |
EMI_Work of 6.6KV Circuit Breakers |
16-02-2023 |
16:00:00 |
CSTPS Group C |
3000035090 |
C&I-III_1269_SW_flow meters |
16-02-2023 |
16:00:00 |
CSTPS Group C |
3000035429 |
CHP-A/T-1028 ENGAGING 2 BUSES STAFF CONV |
16-02-2023 |
16:00:00 |
CSTPS Group D |
3000035350 |
CHP-A/T-1662 DEV & MAIN OF GARDEN CHP-A |
16-02-2023 |
16:00:00 |
CSTPS Group D |
3000035618 |
Civil/T-1809/Reno & interior Hirai Guest |
16-02-2023 |
16:00:00 |
CSTPS Group E |
3000035433 |
CHP-A/T-2016 CONTRACT TATA SUMO/BOLERO/S |
16-02-2023 |
16:00:00 |
CSTPS Group E |
3000034936 |
Civil/T-1560/Cleaning area 400KV switch |
16-02-2023 |
16:00:00 |
CSTPS Group E |
3000035427 |
T516/22_AMC maint high mast towers_CHP |
17-02-2023 |
11:00:00 |
BTPS Group A |
3000035380 |
T686/22 amc for hiring of desert cooler |
17-02-2023 |
11:00:00 |
BTPS Group A |
3000035379 |
T608/22rewinding of LT motors |
17-02-2023 |
11:00:00 |
BTPS Group A |
3000035646 |
AMC OF AC's, WATER COOLER & PURIFIER ETC |
17-02-2023 |
11:00:00 |
CO Group D |
3000035436 |
AMC OF OIL LAB INSTRUMENTS |
17-02-2023 |
11:00:00 |
CO Group D |
3000035455 |
BMI_T1225_W_repl of eco ocils |
17-02-2023 |
16:00:00 |
CSTPS Group A |
3000033880 |
BMI_T1809_Replacement of damaged GI roof |
17-02-2023 |
16:00:00 |
CSTPS Group A |
3000035507 |
FF_WT_2075_AMC FOR ATTENDING FIRE WATER |
17-02-2023 |
16:00:00 |
CSTPS Group C |
3000035491 |
TESTII_INST.OF ENERGY MANAGEMENT SYSTEM |
17-02-2023 |
16:00:00 |
CSTPS Group C |
3000035606 |
CHP-A/RFT-684 SUPPLY OF COLD SOCKETING C |
17-02-2023 |
16:00:00 |
CSTPS Group D |
3000035637 |
Procu cooling tower riser headers ODP |
17-02-2023 |
10:00:00 |
NTPS Group A |
3000035604 |
IT- Desktop Computer Upgradation |
17-02-2023 |
10:00:00 |
NTPS Group A |
3000035407 |
TM II- AWC of HP steam line lkg attnd |
17-02-2023 |
10:00:00 |
NTPS Group A |
3000035464 |
T571/22_AMC replacement decking plateCHP |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035463 |
T630/22_AMC overhauling LT motors_CHP500 |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035459 |
Work of old documents at BTPS |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035446 |
AMC OF DG SET, FF PUMPS TM500 |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035444 |
AMC MAINT
EOT CRAN TM 500 MW |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035328 |
BMC for new chummery (Purna guest house) |
18-02-2023 |
11:00:00 |
BTPS Group A |
3000035506 |
FF_WT_2071_WORK CONTRACT FOR REPAIRING O |
18-02-2023 |
16:00:00 |
CSTPS Group B |
3000035513 |
PROC. OF SS BRAIDED HOSES AHP 660MW |
18-02-2023 |
15:00:00 |
KTPS Group A |
3000035470 |
PROC.OF DOUBLE DISC VALVE AHP 660MW |
18-02-2023 |
15:00:00 |
KTPS Group A |
3000035260 |
CHP-660 W_OVERHAULING LOCOMOTIVE ENGINES |
18-02-2023 |
15:00:00 |
KTPS Group D |
3000035428 |
CIVIL-660 PROVIDING MULTI-TASKING WORKER |
18-02-2023 |
15:00:00 |
KTPS Group E |
3000035578 |
Coal Cell/T-1454/pulveriser crusher |
19-02-2023 |
16:00:00 |
CSTPS Group A |
3000035575 |
WTP_II/T_1267/ORP analyzer |
19-02-2023 |
16:00:00 |
CSTPS Group B |
3000035448 |
EMI_Providing of Black metal at switchya |
19-02-2023 |
16:00:00 |
CSTPS Group C |
3000035392 |
T689/22 maint. of auger machine |
20-02-2023 |
11:00:00 |
BTPS Group A |
3000035255 |
T200/22amc casting machining LT motor |
20-02-2023 |
11:00:00 |
BTPS Group A |
3000035252 |
T550/22Work of painting UAT,GT BUS DUCT |
20-02-2023 |
11:00:00 |
BTPS Group A |
3000035533 |
BMII_T_1761_Non Lubricated Eccentric plu |
20-02-2023 |
16:00:00 |
CSTPS Group A |
3000035532 |
BMII_T_1728_Energy Chain System |
20-02-2023 |
16:00:00 |
CSTPS Group A |
3000035524 |
BMIII_T-1417_Copy of 32465_Supply, insta |
20-02-2023 |
16:00:00 |
CSTPS Group B |
3000035503 |
BMIII_T-2324_Work contract for attending |
20-02-2023 |
16:00:00 |
CSTPS Group B |
3000035456 |
WTP_II/T-2118/analysis of water samples |
20-02-2023 |
16:00:00 |
CSTPS Group B |
3000035493 |
EMI_Work of overhaul,internal inspection |
20-02-2023 |
16:00:00 |
CSTPS Group C |
3000035439 |
EMIII/T1621_Work of repair/shaft of LT m |
20-02-2023 |
16:00:00 |
CSTPS Group C |
3000034431 |
CHPD/1214/Retrofitting of HTCkt with SF6 |
20-02-2023 |
16:00:00 |
CSTPS Group D |
3000035620 |
SUPPLY OF ANHYDROUS AMMONIA GAS |
20-02-2023 |
15:00:00 |
KPKD Group A |
3000034635 |
SUPPLY OF PORTABLE CABIN AT KPKD TPS |
20-02-2023 |
15:00:00 |
KPKD Group A |
3000035512 |
PROC. OF INLET GD SCREEN AHP 660MW |
20-02-2023 |
15:00:00 |
KTPS Group A |
3000035479 |
PROC. OF POWER CYL ASSM AHP 660MW |
20-02-2023 |
15:00:00 |
KTPS Group A |
3000035468 |
Work contract for dosing of cooling wate |
20-02-2023 |
15:00:00 |
KTPS Group B |
3000035336 |
Skilled Manpower (Driver & Computer Op) |
20-02-2023 |
15:00:00 |
KTPS Proj GrpC |
3000035668 |
Pepairing & monor safeauarding of wall |
21-02-2023 |
11:00:00 |
BTPS Group A |
3000035457 |
T672/22 AMC for prev brk maint of lighti |
21-02-2023 |
11:00:00 |
BTPS Group A |
3000035238 |
T346/22Tech assist for undertaking Jobs |
21-02-2023 |
11:00:00 |
BTPS Group A |
3000034758 |
CE/FM/E2/Road/GND-KPKD/2023/34758 |
21-02-2023 |
14:00:00 |
CE (FMC) |
3000035530 |
TESTII_AMC_MAINT.OF WALL SOOT BLOWERS |
21-02-2023 |
16:00:00 |
CSTPS Group A |
3000035352 |
CHPD_BRAKE ASSEMBLIES FOR HYDRAULIC MOTO |
21-02-2023 |
16:00:00 |
CSTPS Group A |
3000035570 |
CHPB/358/Belt Safety |
21-02-2023 |
16:00:00 |
CSTPS Group D |
3000035342 |
Civil/T-1957 AMC alteration & repairs to |
21-02-2023 |
16:00:00 |
CSTPS Group E |
3000035471 |
Availing labourservices for works@St-III |
21-02-2023 |
17:00:00 |
KGSC Group A |
3000035400 |
SUPPLY OF GUIDE VANE & SECTOR PLATE |
21-02-2023 |
17:00:00 |
KGSC Group C |
3000035497 |
Newspaper publishing of Tender & Advt |
21-02-2023 |
15:00:00 |
KPKD Group A |
3000035638 |
T134/22 suply instl 150W LED fixtures |
22-02-2023 |
11:00:00 |
BTPS Group A |
3000035475 |
AMC for computer equipments along with p |
22-02-2023 |
15:00:00 |
CSTPS Civil GrpB |
3000035601 |
BMI_718W_dismantling of ID fan 4A &4B |
22-02-2023 |
16:00:00 |
CSTPS Group A |
3000035327 |
BMI_T2049_ transp of coal mill spares fr |
22-02-2023 |
16:00:00 |
CSTPS Group A |
3000035519 |
I&C-II/T-2113, HP Bypass System |
22-02-2023 |
16:00:00 |
CSTPS Group C |
3000035478 |
WTP-660 Supply of anhydrous ammonia gas |
22-02-2023 |
15:00:00 |
KTPS Group B |
3000035557 |
TM:PROC 100NB GATE VALVE FOR HPBP SYS |
22-02-2023 |
16:00:00 |
PARS Group A |
3000035536 |
BM:PROC. OUTLET BOX, CLASSIFIER HOUSING, |
22-02-2023 |
16:00:00 |
PARS Group A |
3000035535 |
WTP:PROC BOROSILICATE GLASS & PLASTIC |
22-02-2023 |
16:00:00 |
PARS Group A |
3000035543 |
EMT: WORK MAINTENANCE OF AIR COOLER |
22-02-2023 |
16:00:00 |
PARS Group B |
3000035537 |
CHP:WORKS REPLACEMENT OF CONVEYOR |
22-02-2023 |
16:00:00 |
PARS Group D |
3000035250 |
I&C-210 SUPPLY & INSTALLATION,ERECTION |
23-02-2023 |
15:00:00 |
KTPS Group C |
3000035605 |
CIVIL-660 Repairing & maint. of Ash Dyke |
23-02-2023 |
15:00:00 |
KTPS Group E |
3000035572 |
CIVIL-210 CONSTRUCTION RCC ROAD OF STACK |
23-02-2023 |
15:00:00 |
KTPS Group E |
3000035415 |
OUTSOURCING AT BHIRA REST HOUSE |
23-02-2023 |
17:00:00 |
Pune Circle |
3000035401 |
Housekeeping services at REC Pune |
23-02-2023 |
17:00:00 |
Pune Circle |
3000035623 |
AMC hiring ambulance alongwith driver |
24-02-2023 |
11:00:00 |
BTPS Group A |
3000035563 |
T492/22Lifting,rem,coll & transp of ash |
24-02-2023 |
11:00:00 |
BTPS Group A |
3000035699 |
CHEMICALS & CONSUMABLES FOR CCOTL |
24-02-2023 |
11:00:00 |
CO Group D |
3000035567 |
ODPII_W_Sump selection valves AHP U5 |
24-02-2023 |
16:00:00 |
CSTPS Group A |
3000035613 |
I&C-II/T-2158, Defects of critical inst |
24-02-2023 |
16:00:00 |
CSTPS Group C |
3000035700 |
CHPB/1039/LED Fixtures |
24-02-2023 |
16:00:00 |
CSTPS Group D |
3000035574 |
CHPB/1354/Trplex/Duplex roller chains |
24-02-2023 |
16:00:00 |
CSTPS Group D |
3000035565 |
CHPB/1544/Weighbridge & beltweigher |
24-02-2023 |
16:00:00 |
CSTPS Group D |
3000035635 |
CHP-660 W_HIRING FULLY EXHAUST AIRCOOLER |
24-02-2023 |
15:00:00 |
KTPS Group D |
3000035713 |
BMI_T1226_Repl of LTSH coils |
25-02-2023 |
16:00:00 |
CSTPS Group A |
3000035653 |
TM-660 Services of Diving Assistance |
25-02-2023 |
15:00:00 |
KTPS Group B |
3000035642 |
TM-660 Proc. Rising Spindle Gate Valves |
25-02-2023 |
15:00:00 |
KTPS Group B |
3000035544 |
WTP-660 Work contract for handling of bu |
25-02-2023 |
15:00:00 |
KTPS Group B |
3000035721 |
Procu.of auxiliary contactors & its add |
26-02-2023 |
16:00:00 |
CSTPS Group C |
3000035518 |
EM_I/T_2116/filtration LT Transformer |
26-02-2023 |
16:00:00 |
CSTPS Group C |
3000035676 |
TM-660 Proc. of spares for DG set |
27-02-2023 |
15:00:00 |
KTPS Group B |
3000035666 |
TM-660 Proc. of various size ejectors |
27-02-2023 |
15:00:00 |
KTPS Group B |
3000035633 |
TM-660 Chemical Cleaning HP condenser |
27-02-2023 |
15:00:00 |
KTPS Group B |
3000035750 |
CHP-660 W_BCN 13C & D SHORT CON AMC |
27-02-2023 |
15:00:00 |
KTPS Group D |
3000035690 |
CIVIL-210 Restoration of rain cut portio |
27-02-2023 |
15:00:00 |
KTPS Group E |
3000035698 |
Rebabbiting of TGB pads (12 Nos) @GHPS |
27-02-2023 |
15:00:00 |
Nashik Circle |
3000035697 |
Servicing of pump, motor of CWpumps@GHPS |
27-02-2023 |
15:00:00 |
Nashik Circle |
3000035477 |
Advertising in Newspaper |
27-02-2023 |
15:00:00 |
PRO (HO) |
3000034609 |
Consultancy S& T Khaperkheda |
28-02-2023 |
15:00:00 |
Civil I |
3000035794 |
MS-B/T-2072, Renovation of Major store B |
28-02-2023 |
16:00:00 |
CSTPS Group A |
3000035738 |
BM-660 Work of servicing & repairing of |
28-02-2023 |
15:00:00 |
KTPS Group A |
3000035732 |
BM-660 Work of servicing & repairing of |
28-02-2023 |
15:00:00 |
KTPS Group A |
3000035695 |
BM-660 Work of servicing & replacement o |
28-02-2023 |
15:00:00 |
KTPS Group A |
3000035680 |
WTP-660 Work contract for operation and |
28-02-2023 |
15:00:00 |
KTPS Group B |
3000034960 |
TM-660Proc. of complete PVC Fills Module |
28-02-2023 |
15:00:00 |
KTPS Group B |
3000035733 |
EM&T-660 Preventive Maintenance of 21KV, |
28-02-2023 |
15:00:00 |
KTPS Group C |
3000035724 |
CHP-210 RENOVATION OF 52 KG RAIL TRACK |
28-02-2023 |
15:00:00 |
KTPS Group D |
3000035525 |
Hiring LMV as Patrolling vehicle @ GHPS |
28-02-2023 |
15:00:00 |
Nashik Circle |
3000035615 |
WTP- Supply of Hydrogen Gas |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035614 |
WTP- Supply of Bulk Chemicals |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035612 |
WTP- Supply of Fine chemicals |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035591 |
CVL AWC collection/ disposal of garbage |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035590 |
CVL Lifting of dead animals |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035589 |
CVL Work of strengthening, scaffolding |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035588 |
AWC for vertical sanitary UPVC pipe |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035586 |
CVL Internal painting to quarters |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035585 |
CVL AMC for Darna water to Siddhart Naga |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035584 |
CVL AMC for Darna water to samangaon |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035583 |
CVL-AWC attending barrage gates |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035526 |
CHP- Spares for electrnic wagon tipler |
28-02-2023 |
10:00:00 |
NTPS Group A |
3000035608 |
AWC carryout welding & gas cutting I&C |
28-02-2023 |
10:00:00 |
NTPS Group B |
3000035609 |
AWC ETP I, II cleaning/ash removing ODP |
28-02-2023 |
10:00:00 |
NTPS Group C |
3000035607 |
AWC asst to TIC staff TEST II |
28-02-2023 |
10:00:00 |
NTPS Group E |
3000035742 |
CHP:WORK MAINTENANCE APRON FEEDER 1&2 |
28-02-2023 |
16:00:00 |
PARS Group A |
3000035737 |
AHP:PROC 300NB EXPANSION MODIFIED JOINT |
28-02-2023 |
16:00:00 |
PARS Group A |
3000035645 |
ASH: TWO YRS WORK DATA LOGGING WEIGHBRI |
28-02-2023 |
16:00:00 |
PARS Group A |
3000035649 |
CHP:WORK REPAIRING STARTER ALTERNATORS |
28-02-2023 |
16:00:00 |
PARS Group D |
3000035753 |
BM-660 Work of repairing of various duct |
01-03-2023 |
15:00:00 |
KTPS Group A |
3000035751 |
BM-660 Work of reconditioning of Air mot |
01-03-2023 |
15:00:00 |
KTPS Group A |
3000035728 |
BM-660 Work of providing Service Personn |
01-03-2023 |
15:00:00 |
KTPS Group A |
3000035634 |
WTP-660 Work of providing and applying f |
01-03-2023 |
15:00:00 |
KTPS Group B |
3000035725 |
BM-660 Work of repairs of Furnace water |
02-03-2023 |
15:00:00 |
KTPS Group A |
3000035496 |
BMII_T_1786_Fabrication of Strengthening |
14-03-2023 |
16:00:00 |
CSTPS Group A |